Boiler retrofit
A retrofit, not a rebuild.
HydroHub™ is added beside an existing boiler. The fuel, burner, firing system and pressure parts stay as they are.
On site
What changes, and what does not.
What changes
- A generator skid beside the boiler.
- A gas line to the combustion air path.
- A tie-in to the burner management and interlock system.
What does not change
- Fuel.
- Burner.
- Firing system.
- Boiler pressure parts.
Swipe to see the full diagram →
Lifecycle
Six stages from assessment to support.
- 01
Assessment
Paid site or enterprise assessment from operating data. - 02
Design
Sizing, injection point, dosing and interlock specification. - 03
Integration
Installation by the customer's local execution party, to YBG design. - 04
Commissioning
Interlock proving and controlled start-up. - 05
Validation
Baseline-to-result measurement on steam-to-fuel ratio. - 06
Support
Ongoing technical support as design authority.
Assessment data
Data we need for an assessment.
- Boiler make, type and rating
- Fuel and gross calorific value (GCV)
- Steam output and pressure
- Fuel consumption
- Load profile
- Combustion air / FD fan data
- Flue gas analysis
- Electricity cost
Injection point
Engineered from your combustion data.
The injection point and dosing are engineered from the site's own combustion data during assessment, and incorrect injection points are a common cause of poor results elsewhere.
Read how the HydroHub™ platform is built, explore the technical notes on its engineering and measurement, and learn about YBG and the engineering team.
Send us your boiler data.
Assessments are paid engagements. We confirm scope and fee after reviewing your plant data.
