Thermal power utilities
Combustion enhancement for utility coal units
For utilities restoring, recommissioning or upgrading existing coal-fired units: a staged, measured route to better combustion, without a fuel switch or burner change.
Where it fits
Where it fits
After mechanical restoration and recommissioning, once a unit is running reliably, HydroHub™ adds on-demand oxyhydrogen to the existing combustion air to improve how the main fuel burns. No change to the fuel system, burners or DCS control logic beyond the safety interlocks.
Read how the HydroHub™ platform is built, explore the technical notes on its engineering and measurement, and learn about YBG and the engineering team.
Pathway
A staged pathway for first-of-a-kind scale
- 01
Baseline measurement
From the unit's own operating and historian data. - 02
Site survey and engineering design
- 03
Pilot
On a defined section or single unit. - 04
Performance verification
Statistical treatment with ControlAlign™ Measure & Verify: baselined, normalised for load, fuel quality and ambient conditions, steam-to-fuel ratio before and after. - 05
Scale-up
Across units, on the verified result.
Each stage is a decision point for the utility.
Safety
Safety engineering
The system is engineered around interlocks with combustion-air / FD fan status, flame status and hydrogen gas detection, with automatic shutdown. YBG designs have been assessed through an independent HAZOP and SIL/LOPA study.
- Combustion-air / FD fan status
- Flame status
- Hydrogen gas detection
- Automatic shutdown on any trip
Evidence
Evidence and its limits
13% average steam-to-fuel ratio improvement across ten biomass-fired plants in seven Indian states, measured by YBG with client teams.
The client reports ₹7.6 Cr average annual fuel savings and payback under two years at all ten sites. (client-reported)
NOx reduction of 60% was measured at instrumented stacks.
These results come from biomass-fired process-steam plants, not from utility coal units.
- No vendor, YBG included, currently operates an integrated system above 100 TPH equivalent capacity.
- No large-scale independent field study yet exists for electrolytic oxyhydrogen co-firing in commercial coal-fired boilers.
- Performance commitments are made per site, after assessment, on a steam-to-fuel-ratio basis.
Engagement
How engagements work
YBG acts as Advanced Technology Partner and design authority: engineering, specification, equipment supply and Measure & Verify.
YBG is design authority and technology supplier. In India, thermal power and enterprise-wide rollouts are delivered with the YBG–Wevolve Consortium as execution partner; other projects use installers selected by the customer. YBG has no commissioned sales agents.
Engagements are paid. Fees are not published.
Enquiry
Discuss a utility unit
Assessments are paid engagements; we'll confirm scope and fee after reviewing your plant data.
Or email info@ybgindustrial.com