HydroHub flame markHydroHub™by YBG Group InternationalIndustrial Advanced Technology Partner

Thermal power utilities

Combustion enhancement for utility coal units

For utilities restoring, recommissioning or upgrading existing coal-fired units: a staged, measured route to better combustion, without a fuel switch or burner change.

Where it fits

Where it fits

After mechanical restoration and recommissioning, once a unit is running reliably, HydroHub™ adds on-demand oxyhydrogen to the existing combustion air to improve how the main fuel burns. No change to the fuel system, burners or DCS control logic beyond the safety interlocks.

Read how the HydroHub™ platform is built, explore the technical notes on its engineering and measurement, and learn about YBG and the engineering team.

Pathway

A staged pathway for first-of-a-kind scale

Because of the limits set out in the evidence below, every step is measured before the next one is taken.
  1. 01

    Baseline measurement

    From the unit's own operating and historian data.
  2. 02

    Site survey and engineering design

  3. 03

    Pilot

    On a defined section or single unit.
  4. 04

    Performance verification

    Statistical treatment with ControlAlign™ Measure & Verify: baselined, normalised for load, fuel quality and ambient conditions, steam-to-fuel ratio before and after.
  5. 05

    Scale-up

    Across units, on the verified result.

Each stage is a decision point for the utility.

About ControlAlign™ Measure & Verify →

Safety

Safety engineering

The system is engineered around interlocks with combustion-air / FD fan status, flame status and hydrogen gas detection, with automatic shutdown. YBG designs have been assessed through an independent HAZOP and SIL/LOPA study.

  • Combustion-air / FD fan status
  • Flame status
  • Hydrogen gas detection
  • Automatic shutdown on any trip

Safety and engineering →

Evidence

Evidence and its limits

Field result

13% average steam-to-fuel ratio improvement across ten biomass-fired plants in seven Indian states, measured by YBG with client teams.

The client reports ₹7.6 Cr average annual fuel savings and payback under two years at all ten sites. (client-reported)

NOx reduction of 60% was measured at instrumented stacks.

These results come from biomass-fired process-steam plants, not from utility coal units.

  • No vendor, YBG included, currently operates an integrated system above 100 TPH equivalent capacity.
  • No large-scale independent field study yet exists for electrolytic oxyhydrogen co-firing in commercial coal-fired boilers.
  • Performance commitments are made per site, after assessment, on a steam-to-fuel-ratio basis.
Read the full evidence →

Engagement

How engagements work

YBG acts as Advanced Technology Partner and design authority: engineering, specification, equipment supply and Measure & Verify.

YBG is design authority and technology supplier. In India, thermal power and enterprise-wide rollouts are delivered with the YBG–Wevolve Consortium as execution partner; other projects use installers selected by the customer. YBG has no commissioned sales agents.

Engagements are paid. Fees are not published.

Engagement model →

Enquiry

Discuss a utility unit

Assessments are paid engagements; we'll confirm scope and fee after reviewing your plant data.

Or email info@ybgindustrial.com

We use these details only to respond to your enquiry. See our Privacy Policy.